Leak repair to be scheduled in early June

King Water has discovered two minor leaks on fittings in the new pressure
manifold, installed at the pump-house in late March.

The leak repair is covered under warranty, so there will be no cost to the LBCA
to fix the manifold.

To repair these leaks will require a  4 hour system shutdown, tentatively
scheduled during the first week of June.

A notification of the exact date and time will be sent to members, when we get
closer to the date.